Does anyone know if the ‘feature’ in Apps9 on the Master Schedule Set is a bug, where the following happens.
MS Set 1: Master Schedule Level 1 supplies are Fixed within the Planning Time Fence. The MS Process does not change Fixed receipts.
All other MS Sets: Master Schedule supplies are removed whether Fixed or Proposed, and supply is then generated outside PTF?
This functionality makes the Master Schedule for anything other than set 1 unusable.
This behaviour is also not present in Apps10.
Is this a bug with a fix, or an intended feature of Apps9?