Is it possible to freeze a given forecast within a specific window out of the box while allowing a horizon in the future adjust whenever ‘create forecast’ is run?  Does the lead time factor into this within the client or is it just another data point?

 

I’m aware that i could go item by item, toggle the padlock and then move forecasts per period one by one, but it’d be great if they could be locked and the standard ctrl, shift, drag functionality would work.

 

I’d like to use the metrics within IFS so i can compare a lag-1 or a lag-3 forecast’s accuracy/bias/adjustment factor/etc. 