We are creating a Material Requisition (MRN). For example, if we create an MRN for an engine with a quantity of 2, when we create the asset numbers, the system creates the objects and links them through pre-posting.
For the second engine, since there are two separate physical assets, how should we create and link the second asset number? Where should we do the posting for the second engine?
For example, we create a Material Requisition (MRN) for 2 engines. When creating the assets, we creates the objects and links them through pre-posting.
Since the MRN quantity is 2 and there are two separate engine assets, how should we handle the second engine? Where and how should we perform the posting so that the second engine is linked to its respective asset/object number?
Could you please clarify the correct process in IFS Applications 10 for handling multiple assets against one MRN line?