Hi,
When reporting external cost manually on a Work Task with a Object, the external cost reported is visible for the Object ID in Equipment Object Navigator.
But, if reporting external cost manually on a work task without a object , the objects are on Work Tasks steps, the external cost reported is not visible on any of the objects connected to the steps.
How can i report a external cost on a Work Task with steps and get the external cost to be distributed on the differet objects connected the steps? Or can i in some way decide witch object that the cost relates to?
Thanks in advance!
Best answer by Thilini Kumarasinghe