Skip to main content

I have a work task with 2 assignments in status assigned. When i try to change the status of the work task to reported i get below information message:

1. Information message. I expect it to change the status of all remaining assignments to completed.

However, when i press OK i get this toaster message and status of assignments remains the same:

2. Toaster message appears

I can change status on assignment if i only mark one line, but i cant multi select lines and change status.

3. Possible to change status on one line
4. But not possible to change status on 2 lines at the same time. Why cant i change the status on 2 lines at the same time?

 

Tested in 22R2 SU4 https://ifs22r2costestlkp.rnd.ifsdevworld.com/ on Work task 582. 

 

Be the first to reply!

Reply