HI,
We have a use case with 3 PM schedule maintenance for a same product:
1/ Maintenance 1 : each 6 weeks problem code A
2/ Maintenance 2 : each 3 months problem code B
3/ Maintenance 3 : 1 per Year Problem code C
Each of them have the own pace, they are not linked in cycle.
For the Maintenance 1 : For example : I have this shedule : 02/01/24, 15/02/24, etc each 6 weeks.
If for this planned date (02/01) , I finally run the MP the 15/01, i would like to automatically posponed the second date : 15/02 to 28/02.
We tried this PM Schedule maintenance, but it doesn’t work.
After the first MP Done, the second PM date, still at the same planned date.
What can be the best way to design this PM schedule ?
Why we cannot use the “Floating PM” with a schedule “Alone” ?
Thanks and Regards
anthony