Hi All,
Is it is possible to schedule the report generated with report generator (Refer to the below screen capture)?

All the parameters would be same, the only what changes is period.
Report should be run the 4th-5th day of the month for the previous month results (on the 4th of October we run the report for data for September).
Could you please advise if there is any option to make this as a schedule in IFS?