Hi,
If I have Shop Order where we are going to manufacture a specific product with eng rev X. The Eng rev X requires underlying material to have a certain eng rev to go into this structure. However, when reserving material to the shop order it is till possible for me to reserve other revisions that are too low even if the product structure points at a higher revision required to manufacture the product with eng rev x.
Is there a way to make sure that a product structure connected to a shop order only points to the material with correct revision in the inventory?