I need define the run time of machine and workers in diferentes situations and don´t forger these time affect to load and capacity:
Situation 1:
AUTOMATIC MACHINES CNC machining centers with multiple pallets where two or more operations of different durations are combined during a shift. It only requires the operator to change the part, but the machine does not stop.
EXAMPLE 1: The machining takes 60 minutes, and the operator changes the part while the machine is machining another part.
Situation 2:
SEMI-AUTOMATIC MACHINES CNC machining centers with multiple pallets where two or more operations of different durations are combined during a shift. Requires the operator to change the piece.
EXAMPLE 2: Machining takes 50 minutes and the operator takes 5 to change the piece with the machine stopped.
Situation 3:
MANUAL MACHINES centers such as LATHES, MILLS, SAWS, OR MANUAL DRILLS where operators perform operations one by one or consecutively. Requires the operator at the machine 100% of the time
EXAMPLE 3: Machining takes 10 minutes and the operator takes 5 to change the piece with the machine stopped
Situation 4:
MANUAL OPERATIONS centers such as FINISHING, ASSEMBLY, or INSPECTION where no machine is involved and operators perform operations one by one or consecutively.
EXAMPLE 4: The operation takes 5 minutes
I think the best answers for each situation are:
Situation 1:
Machine time: 60 Operator time: 0
Situation 2:
Machine time: 55 Operator time: 5
Situation 3:
Machine time: 15 Operator time: 0
Situation 4:
Machine time: 0 Operator time: 5
How can these run time of machine and operators affect to capacity ? Can i see the hours used for machine and operator in Operation Stadistic screen?