Skip to main content

I have created a Manufacturing Control Plan Template and assigned this to specific Part Numbers.

The control plan works fine until a new revision is made on the Product Structure or Routing, it then loses connection. The control plan then needs to be re-connected with the new revision.

 

Is there a way to stop this from happening so the Control Plan does not disconnect from the part when a revision is created?

 

Thank you!

Hi Chris,

This is how a manufacturing Control Plan works with Shop Order. 

Each Manufacturing Control Plan configured for Part Revision, Routing Revision and Routing Alternate combination. In order to apply any Control Plan to Shop Order, combination of mentioned three properties should be at Shop Order and Control Plan level.

 

Regards

Abdul Rehman


Reply