Hi,
Is there a method to book or block a tool, ensuring that it is not simultaneously used for another task? From my understanding, it is currently not possible to automatically schedule and reserve a tool from the PSO since tool/equipment resources are not considered Scheduling Resources.
However, within the Standard Task, it is feasible to insert a demand line of type Tool/Equipment, although this must be manually allocated.
How can I view the calendar of these tools to determine their usage, and how can I ensure that no other task utilizes the tool on the same time?
Thanks,
Stefania