What is the correct value to put in Earned Value Cost?
I have created a DOP header connected to PJ.
Depending on the Structure Depth setting, the Earned Value Cost value is different.
Please let me know what value should be set for Earned Value Cost.
Pattern A:DOP Parts. Earned Value Cost is 420,000
PatternB:Full Level Earned Value Cost is null(0)