Hi Community,
We have recently upgraded from 24R1 to 25R1 and have noticed a difference on the time registration in the Work Task. Previously a user would be able to select the Resource Group from the LOV, now in 25R1 we can only see the Resource Group for the user. As we have work that can be carried out / assisted by different several Resource’s, we need to be able to register time quickly for those.
How we record time:

How it looked with 24R1

How it looks now in 25R1

Would anyone know how to go back to seeing all of our Resource Groups?
I know it possible to register others on the Resource tab and report time that way, but we really do not want the extra admin associated.