I am having a project deliverable structure as below.

[level 1]: material project deliverable item connected to a manufactured inventory part with MRP code A

 [level 2] : non material project deliverable item connected to a manufactured inventory part with MRP code P (or K) and engineering phantom part with MPL part value "no demand"

  [level 3] : material project deliverable item connected to a purchased inventory part

 

When I create the shop order for [level 1], the components are correctly fetched from the phantom parts but - again - the phantom part n° is not displayed on the shop order material line.

In this case, the phantom part exists as an inventory part, so why isn't it working?

Best answer by Peshala Fernando

Hi Ushan,

 

Handling of phantom parts in a Shop Order which is originated from project deliverables is different to its handling in a manufacturing Shop Order. Even though the Phantom Part No is displayed on the manufacturing shop order material line for parts which have both planning methods K and P, in project deliverables originated shop order the Phantom part No is displayed for structures with Phantom parts which are planning method K (blow through) and are Std Planned Items. That is a designed behaviour which have been developed considering the usage of project deliverables and it has functional differences contrast to manufacturing.

 

Hope this clarify your question.

 

Regards,

Peshala.

View original
Did this topic help you find an answer to your question?
50% found this helpful

2 replies

Forum|alt.badge.img+9

Hi Ushan,

 

Handling of phantom parts in a Shop Order which is originated from project deliverables is different to its handling in a manufacturing Shop Order. Even though the Phantom Part No is displayed on the manufacturing shop order material line for parts which have both planning methods K and P, in project deliverables originated shop order the Phantom part No is displayed for structures with Phantom parts which are planning method K (blow through) and are Std Planned Items. That is a designed behaviour which have been developed considering the usage of project deliverables and it has functional differences contrast to manufacturing.

 

Hope this clarify your question.

 

Regards,

Peshala.


Ushan Senarath
Hero (Employee)
Forum|alt.badge.img+11
  • Author
  • Hero (Employee)
  • 45 replies
  • March 15, 2022

@Peshala Fernando Thanks for the explanation.