Hi All,
When Time Registration is performed in the Projects module for a Contractor, an additional level of detail is revealed where a mandatory PO and PO Line have to be selected.
However, when recording time on a Work Task, the selection of a PO and PO Line is not required and no PO connection is required.
My indicator for specifying a Resource as a Contractor for Work Task purposes is when the Site Settings on the Maintenance/Service tab for the Resource has a Supplier ID specified.
Was there a good reason why the PO and PO Line is not required when registering time for a Contractor on a Work Task ?