In Apps 10 IEE a user can select multiple Material Transfer Requisition Lines and the Release command is available to process them all of them at once. In Cloud 23R2 we are finding that with one selected, the Release command is available. However if the user selects multiple lines, the Release command goes away. We made sure the lines selected are all in Planned status which is a pre-req to be able to release. Is this by design, or is this a bug?
Thanks!