Hi
Is this possible to mix an alternate of Product structure and product routing ?
What I mean by that, we have Top Item T (as “T”op) and T consist of components C1, C2
Whereas components C1 and C2 are done in 2 separate routings. This differences in routings are the suppliers (let’s call them S1/S2) of Outside Operation (this OO is a operation within a SO for C1/C2)
And the thing is we need to keep C1/C2 as same parts whenever they are done through S1 or S2 supplier (1 inventory part at least)
And we need to choose on the Customer Order creation if T shall Contains C1/C2 made on S1 or S2 (both shall be made in this same supplier)
So in my understanding, we could possible have 2 separate structure alternates for T
and this structure alterantes should differ only of the ROUTING use in the C1 and C2 products
That would be the simplest i think, but I don’t see any possibility to mix structure and routing alternate
Do you see a way to bypass that ?