Looking for methods anyone has used to handle the following:
Apps10 update10
Manufacturing a serial-tracked, lot-tracked, multi-level tracked part through (4) operations. Lot size = 5, manufacturing serials 1-5.
Site is set to auto-build the tracked structures.
All component material is issued, all of which is serial and lot-tracked also.
At op #2, I want to scrap serial #1.
After performing a scrap for a quantity of (1) (cannot designate the serial I am scrapping, i.e., not going to receive), I delete serial #1 from the list of reserved serials, which alters the relations in the as-built structures.
What has been your experience in best practice for getting the as-builts correct after scrapping a serial part? Do not auto-build ahead of time? Wait until receipt to build them and alter them?