Hi all,
Frequently we have to make a tool used for manufacturing a part.
We create the tool in IFS and connect it to a routing.
But how do we handle that the tool must be manufactured before we can release the shop order for the part?
Hi all,
Frequently we have to make a tool used for manufacturing a part.
We create the tool in IFS and connect it to a routing.
But how do we handle that the tool must be manufactured before we can release the shop order for the part?
Hello, you can link the manufacturing tool to a serial object (service and maintenance module in Apps9) where you can create a work order for it to be manufactured. However I am not sure if this will flag that it needs to be manufactured before the shop order will run, whoever this might be a good place to start and some custom events might be the best way to flag this to production
Hi,
In addition to that, a Tool/Equipment can be connected to a Manufacturing Tool Instance. The tool/equipment can be used for resource planning and as a maintenance object.
The tool/equipment needs to be connected to the site defined for the manufacturing tool. The manufacturing tool instance cannot be connected to more than one tool/equipment, but one tool/equipment can be connected to manufacturing tool instances on different sites. The tool/equipment needs to be connected to the same site as the manufacturing tool.
From the Resource Navigator window:
From the Manufacturing Tool window:
Hope this clarifies the issue at hand.
Regards,
Dasuni
Thank you for the suggestions. We are looking into it.
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.