Hello,
I am using IFS Apps 10 and we have enabled Control Plan Mandatory and Create Analysis Mandatory in the QA controls. This has been working as expected, however, we have to disable the controls when a Rework Shop Order is opened.
As an example we need to Rework PN 123456. So a SO is opened for it and the Rework flag is checked. The Operations are modified to suit the rework (deburr, sanding, etc.). All original operations are removed and the rework operation(s) are added. All original materials are removed and the top level part number is added (for rework) to the material.
The connected control plan still has all the checks for the original steps, which I mark as not included. However, when you attempt to receive the Shop Order, the system errors out stating that is expecting you to complete checks for operations that you have removed and checks you have not included. I have found no way around this other than to disable the QA controls, report the rework Shop Order and turn them back.
This seems like an issue, as you’re not having to modify basic data for every part you rework. I’ve checked the help, but I do not see anything related to how you would address this issue. The control checks cannot be removed, because they’re part of the master control plan.
I’m not sure if there is a workaround for this, or what the correct process should be. Any guidance would be greatly appreciated.