I have a query regarding the Change Order window.

There is no field to check the Performed Date and Completed Date for an Engineering Change Order. 

Below is where the CO Approved Date and Analyzed Date can be checked. We need to know where the Performed Date and Completed Date can be found.

Could you please suggest or advise on this issue?
 


 

Hi ​@imkhin 

below are some possıible solutions:

1. Verify Field Configuration in IFS Setup

  • Navigate to Solution Manager > Configuration > Page Designer.
  • Locate the Change Order window and check if fields like Performed Date and Completed Date exist but are hidden.
  • Enable these fields by configuring their visibility.

2. Check the Logical Unit (LU) and Attributes

  • Identify the LU used for Engineering Change Orders (e.g., ChangeOrder or ECO).
  • Review the attributes in the LU to confirm if these fields exist.
  • If they do not exist:
    • Add them using Custom Attributes.
    • Link them to the Change Order window.