We have multiple situations where shop order pick lists are being generated and the operation is missing leading to components not being picked. All structures have operations connected to them, but these are not being pulled through onto shop orders. I’m wandering whether this is because the product structure that they are called up in is planning method P (phantom)?
For information:
Pick Lists are created per Work Centre
All shop order material parameters are %
Max orders per pick list is 1
Include Unconnected material is toggled on
Planning Methods Used for manufactured parts - A and P
Planning Methods Used for purchased parts - B