Our engineering department would like to use outside operation within manufacturing routings which will all have there own individual work centres set to ‘outside work centre’ and have a connected supplier to reduce the number of levels within a structure.
This seems to make sense as it can dramatically reduce the time and complexity of engineering required but our procurement department raised two issues
Issue :1 limited forward visibility of future purchase requisitions and purchase orders, not visible until the shop order (with the outside operation) has been released, as when they are at planned this doesn't drive any demand.
Question: is there a way procurement can have greater visibility of future purchases requisitions or orders?
Issue 2: visibility of parts currently out being processed by an outside operation.
Question: how do they see what parts are currently at an outside operation?