It is about the Operation Reporting with Barcode page.
In this screen fields about time reporting are automatically filled in with the routing time once the operation ID is completed.
Is there any impact of following setting on the “Operation Reporting with Barcode” process ?
Work center setting (screenshot 1):
- auto report labor time with qty => never
- auto report machine time with qty => never
Site settings (screenshot 2):
- default remaining time to report => no
With these settings, in the shop floor workbench, it actually works (screenshot 3), need to fill in manually the times to report. But unable to see any effect on the Operation Reporting with Barcode screen (screenshot 4).