When multi-level tracking is required on Lot/Batch enabled parts, there are scenarios where standard quantity of a component in the product structure is not truly required to complete the produced part, for example it would OK to issue 9.8 pounds of flour instead of 10. Or perhaps the component quantities are not discrete, rather going out several decimal places in quantity required, for example a component UOM is pounds. And as long as the actual amount issued is close to this it would be OK. With Multi-level tracking turned on, none of these scenarios are possible, as the tracked structure requires all the required quantity to be reserved or issued, or the tracked structure is not complete.
Has anyone found work-arounds for this? I am thinking it might require a modfication to change the validations to allow some level of tolerance around quantity issued versus qty required.