Question

MS Level 1 Not considering the site setup 'Use Current Revision for Past due Supply'

  • February 11, 2026
  • 3 replies
  • 27 views

Ex1SivasG
Do Gooder (Partner)
Forum|alt.badge.img+3

Hello,

 

In 24R2 - MS 1 is always creating the Supply request (Shop Ord Req) considering the product structure revision based on the Due date even though ‘Use Current Revision for Past Due Supplies’ check box is enabled at Site level. 

With the Same setup at site level, we tried the below scenario

  • Created manual Shop Ord Req with the due date as in the MS generated Shop Ord Req, it is picking up the latest revision, not considering the due date of the shop order. 
  • Manually updating the quantity in MS 1 generated Shop Ord Req, the Product structure revision changed to the latest revision in the Shop requisition 

Conclusion: MS1 is not working as expected with ‘Use Current Revision for Past Due Supplies’ check box is enabled at Site level. 

I am not sure whether i need to setup some thing more to Use this feature for MS1.

 

Appreciate your help in advance.

 

Thanks,

Siva

 

3 replies

Yathartha Karunananda
Hero (Employee)
Forum|alt.badge.img+11

Hi ​@Ex1SivasG,

If ‘Use Current Revision for Past Due Supplies’ option is enabled, when the start date of a supply (shop orders, shop order requisitions) is past due, the revision that is buildable on the site date will be selected instead of the revision effective on the start date. This option does NOT evaluate the Due Date.


Ex1SivasG
Do Gooder (Partner)
Forum|alt.badge.img+3
  • Author
  • Do Gooder (Partner)
  • February 11, 2026

HI ​@Yathartha Karunananda 

 

Thanks for the quick reply. 

But it looks it is working differently when we create Shop Ord Req Manually and through Shop Ord Req through MS Level 1

Example:

I have a part with 5 revisions as below:

 

 

In Site ‘Use Current Revision for Past Due Supplies’ option is enabled,

the MS generated Shop Ord Req with start date = 12/9/2025 picked up Structure Revision: 3. 

Manual Shop Ord Req with start date = 12/9/2025 picked up Structure Revision: 4.

The issue is in case of MS1 generated Shop Ord Req it is not working similar like a manual Shop Ord Req.

Thanks,

Siva

 


Yathartha Karunananda
Hero (Employee)
Forum|alt.badge.img+11

Hi ​@Ex1SivasG,

You are correct. This seems to be an issue. The same behavior could be seen in 25R2. Please raise a support ticket.