Is there any way in IFS 10 to make MRP result as Production Smoothing (Heijunka) ? The purpose is smoothing of production quantities or supplier schedule per material within a leveling period.
I see this feature is available at SAP.

thanks
Is there any way in IFS 10 to make MRP result as Production Smoothing (Heijunka) ? The purpose is smoothing of production quantities or supplier schedule per material within a leveling period.
I see this feature is available at SAP.
thanks
Best answer by Björn Hultgren
Prior to apps 10 this was only adopted for manufacturing using production schedules, but in apps 10 it can also be used for manufacturing with shop orders.
You need to connect parts to a production line and set the parts Proposal Release to Do Not Release. I.e. MRP will not generate any requisitions.
In Production Line Management window you will then retrieve the demand for the parts producted on the line from e.g. MRP
You must also calculate the daily operating minutes
Next you can calculate the required Takt Time to meet the demand
Then you can set a Line Rate
Then use Generate Proposed Schedule . Here you can select to generate a finite schedule taking the line rate into consideration.
This proposed schedule can be analyzed against the demands to ensure all demands will be met, else you can manually change the schedule to ensure the demands are met.
When the schedule look good you can convert it into shop order requisitions and when inside the firm horizon you can convert it into shop orders