Kanban Reorder point does not create transport task line to move a part/lot batch no from a location with different or no availability controls id to the destination location.
Not all the stock is to be available for MRP or automatic reservation; this is achieved by the application of availability controls ids. It is then sometimes necessary to replenish either the maintenance or research location (Kanban or manually) and it not possible to move if only one lot/batch is in stock.
With the new tick box in the Site > Extended Site info > Inventory > Transport task tab
A new tick was introduced, Allow Deviating Part Availability Control] it enables the transport task to be executed irrespective of what availability control ID in source and destination location.
This was only valid for manually created transport tasks.
A customer is looking for this same control for a transport task created via Kanban replenishment. (auto). Would like your feedback in handling this scenario?