In IFSv10, do setup and factor unit “hours” costs distribute based on the quantity quoted or based on the standard lot size from the inventory part or part cost record? In IFSv7.5, we had issues with it based on the quotation even though we manufacture in a higher lot size. Is there a way to base all interim cost calculations based on a standard lot size to avoid cost variation for the same part?
It looks like a new field was added in part cost/part cost details called Standard sales quantity. How is this used?