Hi,
Some questions about the FMEA module:
- For the same failure, I can add multiple effects and causes. However, to have a correct RPN score, I want to link a specific cause with a specific effect. Currently, IFS always links the cause with the first effect of the list. How can I link it with the second effect?
- Is there a way to include/see if a FMEA for a subassembly has allready been done in the final assembly? Example: I have subbassemblies A and B, which I manufacture seperately. I have Product structure for C, which consists of A and B. I would like to see in my structure for C that I allready have a FMEA for A. You can check by going to the structure of A, but if A is used in many other structures that wouldn’t be convenient
Using APP10
Thanks!