Attempting to schedule operations using the advanced planning board. Ops 10 and 20 on each shop order are routed to the same work center. I would like to schedule these operations back to back and complete both operations before moving to a different shop order.
The APB is scheduling operation 10 from one order, then operation 10 from another order, then back to operation 20 on the original, then 20 on the next and so on.
Is there a way to influence scheduling to complete both operations on one order before moving on to the next order?