Apps10 Update 8 IEE
In multi-level tracking, when a component is reserved in a quantity that includes its planned scrap quantity, this over-reservation is not accounted for when attempting to over-report an operation or over-receive in production. User receives an error message that there are not enough reservations for the tracked part and it must be reserved before it is issued.
Setup:
Shop Order:
Part No. = M-987
Lot Tracking = Order Based
Lot Quantity Rule = One Lot Per Production Order
Multi-Level Tracking = YES
Lot Size = 40
Shop Order Materials:
Component Part No. = P-987 (Purchased, Lot-Tracked, Multi-Level Tracked)
Quantity Per Assembly = 1
Component Scrap = 4
Qty Required = 44
Qty Required Excl Plan Scrap = 40
Reserve/Issue Method = Reserve and Backflush
Reserve/Issue Planned Scrap = YES
Issue Overreported Qty = YES
Operation No = 10
Shop Order Operations:
Operation 10 Op Qty = 40
Inventory Situation:
Available Inventory of P-987 = 100, Lot/Batch = AAA
Process the Shop Order:
Manually reserve all (44) of P-987.
Report operation 10, Qty to Report = 41.
Note: I am over-reporting because all of the reserved components were of good quality. I did not need to scrap any of the reserved component quantity, so I decided to over-report and eventually over-produce.
ERROR MESSAGE: “There are not enough reservations for the tracked part P-987. It must be reserved before it is issued, as the parent part is multilevel tracked.”
I have over-reserved the component, so there should be enough reservations to satisfy the over-report.
Receive Reserved Lots
Qty to Receive = 41
Auto Report of Operations = YES
ERROR MESSAGE: “There are not enough reservations for the tracked part P-987. It must be reserved before it is issued, as the parent part is multilevel tracked”.
I have over-reserved the component, so there should be enough reservations to satisfy the over-receive.
Adjust Lot Size of Shop Order from 40 to 41.
Lot/Batch Qty automatically adjusts from 40 to 41.
Qty Required of P-987 = 45.
Qty Reserved of P-987 = 44.
Report operation 10, Qty to Report = 41.
ERROR MESSAGE: “There are not enough reservations for the tracked part P-987. It must be reserved before it is issued, as the parent part is multilevel tracked.”
I have over-reserved the component, so there should be enough reservations to satisfy the over-report.
Receive Reserved Lots
Qty to Receive = 41
Auto Report of Operations = YES
ERROR MESSAGE: “There are not enough reservations for the tracked part P-987. It must be reserved before it is issued, as the parent part is multilevel tracked.”
I have over-reserved the component, so there should be enough reservations to satisfy the over-receive.
Seems odd that that reserving the quantity of planned scrap does not allow over-reporting or over-receipt.