Skip to main content

Hi,

We have a problem in IFS Cloud (recreated in both 24R1 and 24R2) when it comes to automatically creation of normal time by the background job “Generate Timrep Intervals and Hours”  in combination with increments (or overtime or other time reportings) already reported before the day is handled by the background job.

 

It works as expected/requested for employees with time base “Generated results” but not for employees with time base “Generated clockings”.

 

This creates an issue when an employee has for example planned stand-by-time (increment) that is registered for a future day (a day that has not been handled by the background job yet). When the day is handled by the background job, it does not create normal time if there’s already any time reports on that day (if employee has time type “Generated clockings”).

 

In IFS 10, the normal time is being automatically created in the same case (i.e employee has time base “generated clockings” and increment/other time is registered beforehand).

 

Has anyone had a similar issue? Is it “by design” that the normal time is not created in this scenario? Is there any setup I can do to change so that the normal time gets created?

 

Thanks!

Hi,

It should be possible to get generated time even if you have entered increments - however note that it will not work if you entered any other time type, like normal or overtime.

If this doesn’t work in IFS Cloud this is a bug. We had the same problem in an earlier version (maybe IFS 8, but it was corrected at the time and has worked since)

Regards,

Maria