Skip to main content

Version: IFS Cloud 23R2

 

Employee is having valid schedule. Absence Type MDL001 is configured as ‘Calendar Days’

When applying this leave for half day (with either First half or Second half), it is doing wrong calculation.

It is calculating Absence Duration as 0.17 Calendar Days, however it should be 0.5 days. Employee schedule is 8 hours; however system is doing calculation based on 4 hours/ 24 hours = 0.1666 days.

 

There is another absence ‘Annual Vacation’ which is configured as ‘Working Days’, for that system is calculating half day leave correctly.

The issue is happening when Absence is configured based on ‘Calendar Days’.

Anyone has any idea about this issue? Please provide resolution, if you are aware.

Thanks

Vikas Jain

Dear Community,

Please let me know if anyone is having any solution/ suggestions for this problem.

Thanks

Vikas Jain


Hi ​@VikasJain 
You already described the behavior of calendar days: it calculates based on 24h instead of scheduled hours.
At one point, I also hoped it would calculate based on scheduled hours, including entries for weekends or public holidays - but unfortunately, I had to take work hours and do any additional calculations for this specific case outside of IFS. 
 

KR,

Anny
 


Thanks ​@Anny  for your response

Best Regards

Vikas Jain


Reply