Version: IFS Cloud 23R2
Employee is having valid schedule. Absence Type MDL001 is configured as ‘Calendar Days’
When applying this leave for half day (with either First half or Second half), it is doing wrong calculation.

It is calculating Absence Duration as 0.17 Calendar Days, however it should be 0.5 days. Employee schedule is 8 hours; however system is doing calculation based on 4 hours/ 24 hours = 0.1666 days.
There is another absence ‘Annual Vacation’ which is configured as ‘Working Days’, for that system is calculating half day leave correctly.
The issue is happening when Absence is configured based on ‘Calendar Days’.
Anyone has any idea about this issue? Please provide resolution, if you are aware.
Thanks
Vikas Jain