Not allowed to enter code parts when expense line is connected to a Work task


Forum|alt.badge.img+2

While entering an expense sheet, we would like to manually edit the code parts attached to the expense line (This is attached to a work task). However we are not allowed to manually edit the code parts.

 

Is this an inbuilt control to prevent postings manually to a work task or is there a way we can manually modify the code parts?

 

 

Forum|alt.badge.img+5
  • Sidekick (Partner)
  • March 14, 2024

@NovAntonF - were you able to figure out the cause of this error? We are experiencing it too in IFS Cloud environments. I have never run into this issue with Project Activities that are connected to expenses. 

 

Thank you,

  Nik 


Forum|alt.badge.img+2
  • Do Gooder (Partner)
  • March 18, 2024

Unfortunately no.. We did not deep dive into it as this particular case was less important.

 