Skip to main content

Hi Team,

when creating CO Lines with two different Supply Codes Invent Order and Purch Order Trans:

Than release the order and check the Shipment lines:

 So the next Step in Shipment Flow should be “Reserve, Create Pick List” and not “Create Pick List” because the second line with Purch Order Transit is not arrived and reserved.

 

When testing same behavior but with both of CO lines with Supply Code “Invent order”:

 

than release and check the shipment lines:

 

→ so in this case the next step is correct, the second line is not reserved and I can see It also in the next step.

HI,

The Next Step in Shipment Flow field is decided in the same way that we decide when the different commands are enabled i.e. which will be the next step/command to execute in the Shipment page. When you have a pegged line the Reserve command is not enabled in the shipment. The reservation will happen at receipt of the Purchase Order. 

Best Regards

Fredrik


Reply