Good afternoon,
We are trying to see if it is possible for MRP to create a purchase requisition with minimum lot size and supplier split.
For example:
supplier A - 70%
supplier B - 30%
Part A has a minimum lot size of 24 pcs → MRP will generate a requisition that follows minimum lot size of 24. After this it will than split the requisition quantity to the 70% and 30%. The numbers that are left after the supplier split are no longer in multiples of 24.