Can you have the pre-posting selected within the project navigator so that it is pulled into the req when the requisition is created. Rather than having to assign every line the pre-posting individually - - a PO that will have 100 lines, this gets time consuming.
Hi
Do you want to copy all Pre posting setup in the Project to your PR line created from the Demand tab?
If that is the requirement then it is possible.
- I have a Project with following Pre posting
- Setup posting control for M113.
- Create a demand line.
- Create a PR and see for Pre posting.
Is this what you expected?
Regards,
Kasun