Materials required can be connected to PM actions by creating a line with necessary part and quantity in the Work list/Materials tab of the PM Action windows.
As mentioned in F1 documentation It is possible to configure the system to automatically create demands from the PM actions.
Thus Inventory part demands created from the PM action's maintenance plan lines are available to be queried from the Inventory Part Availability Planning window.
How to do this configuration setup, in the system?