When trying to create a Calendar based Maintenance Plan, and having entered all the relevant data, the system generates an error message

The system does not recognize any of either the Action specified in the Selection Parameters as being valid:

Nor does it recognize any of the PM Actions within the system:

I can find no way at either the Actions or PM Actions level of being able to do anything that will change their status or validity to prevent the error message from being generated