Hello All.When I have a huge list in my maintenance plan (PM action), how can i hide the first row when the WO is finished. I want to see on the first row only the next one that required a WO to be generated.Thanks a lot
In a company A, there are two sites (Site1&Site2). The maint org. of Site1 create a fault report and the maint org. of site2 should execute. The two sites are two différent business units. What setup (Main org., resources,..) do I need to make this possible?
I’ve got a training of lobby on EE. But I don’t see any material on IFS Cloud. Please help.Thank you in advance
Hello!As an IFS partner employee, I’ve setup my new training plan to get certified by the end of this year. I’ve tried to scan all training available for free to get familiarized with the provided traing modules. I’ve downloaded all the documents on the certification process and I’ve finally made my own certification plan according to my actual knowledge. I was a bit loss during the navigation but it’s a part of the process. May be IFS can improve how to find easily any items we are looking for.Today I’ve started form the basic requirements required by the certification. Some of them are free but many requires fees. I consider myself as an expert on the domain I’ve choosen but I dind’t see easily how to pass the test on those prerequisted modules to evaluate myself before the certification. Howether, I’ve got an appointment to pass my test by the end of november this year. If you can explain to me step by step how to get to the final exam (Project management), it would be great Thank y
Hello!My article is linked to a provider with quality control at arrival according to an existing control plan. When article are delivered, IFS doesn’t accept until quality control is completed. The same scenario is reproduced with a delivery at stockage location, the quality control is not required (not a normal quality process). How to correct this process with IFS? Thanks.
Hello All!I’ve setup a data source with this SQL condition : And it works fine in a simple counter element.But it doesn’t work on AURENA even if the Client type is ‘AURENA’. Thanks for your help
Some basic functions working on EE doesn’t work correctly on AURENA. For example, I can put an ending date of a BT on EE but not on AURENA. In such case, how do I solve the issue?Thank you
By defaut, the VMI quantity in stock is not available in MRP netting. Is it possible to change this availabity control? If not, what do you suggest?Great thank to all ideas or suggestions.
Hello!When I execute the MRP, the VMI component quantity in stock is not visible. How to make the VMI quantity in stock accessible from the MRP flow? Using an alternate component in the VMI stock? I’m not sure. What else?Could someone help?
Is there an IFS expert who could give an idea how to diagnose the cause of this wrong calculation on my invoice order. The right price order are in red. Thank you.
The three last lines in the attached order request is showing wrong calculations of the unit price X qty. Where and how this error can be corrected on IFS EE?Thanks to all answers.
Hello! I need to test authorization in the P2p workflow. All request order I create pass through autorization. I notice that the authorization required is never checked. Could someone help me to get this “authorization request” checked? See an example attached. Thank you in advance.
I’ve created a new shop order by following a training doc support. I’ve got the following error message : “Structure Revision is null. Issuing is not allowed”. And during the flow, the following question (Popup) appears : “The shop order is for revision of part XXX-YYY. The location you selected in row 1 have different revison for the part. Do you want to continue?” I’ve answerd yes after checking that they are both rev 1. All advices are welcome. Thank you.
I’m a new on IFS and I’ve followed a 2 months training on IFS apps10. When I create a distr. order, I need to repeat the process many times or click on refresh many times to get it released. Is it possible to scan this process execution through a menu (background processing)? and how to do it?
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.