Dear all, Any ideas how a project manager can disapprove a project transaction, with the result the employee created this transaction will be informed to update or change the transaction. Kind regards,Vincent Heijmer
I’ve got the following scenario:I created a first version of a BOM in EPDM and imported this via Cadlink in IFS. Result Engineering parts (and structure) are created.I selected the parent part of the BOM to a project deliverable and selected the option copy PDM structure all levels. Result the components of the structure are created as Project Deliverable components. So far so good.Than the BOM in EPDM is updated (new revisions of components or new components added), via Calink the changes are added to IFS and added to the engineering “structure”.Now i want to update my project deliverable to with the changes made to the parent part and underlaying parts, but with the option Copy PDM structure all levels , the full list of components is added again so of lot of components are double in the project structure.Any ideas?Kind regards,Vincent Heijmer
Case:Clocking's are started on day 1 and stopped on another day. Some of the durations are calculated on a 24 hours timeframe for example:start time : 19/10/2023 07:35:00stop time: 20/10/2023 07:47:00duration : 23.2 (standard break from 12-13 each working day)time share and crew size = 1Other duration are calculated on a 8 hour timeframe for examplestart time: 19/10/2023 10:14:00stop time: 20/10/2023 09:29:00duration : 7.25time share and crew size = 1We are using on standard calendar on all levels (labor class, employee, work center etc)settings on site : calendar consideration: calendar time and overtimeQuestionWhat is the reason for the different calculation of the duration in the clockings?
ErrorSerial aaa for part bbb already exists on a specific stock or transit record issue.CasePart is serial traced, not traced in inventory, but specific part has been identified so has a single record in inventory part in stock, other stock is of this part is “anonymous” (*)Part is reserved for shop order and via wadaco shop order picking the specific part has been selected to be picked. Result error as described occurs.Please advise, kind regards,Vincent Heijmer
Hello,Does anyone knows if it’s possible to use GS1 labels in shop floor workbench - handle structure by barcode functionality? We are implementing GS1 labels in our warehouse including batch or serial number,. Now is the question if the shop floor module can handle these labels to extract this number for structure purposes? Gr, Vincent
is it possible to change the order in bookmarks? Adding a new bookmark always comes to the end of the list within a group….
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.