Problem: It is not possible to create clickable hyperlinks in IFS Cloud environments (same issue with APP10 Aurena). The workaround is to create an ExternalNavigatorLink/ NavigatorLink type custom command button.Request/ Idea: Include the Clickable Hyperlinks feature in IFS CloudCase ID: CS0072387
Hi,Our customer has a requirement of creating a conditional custom field as follows,Scenario: Adding a condition on a custom field that is getting mandatory when a value of another field that is in another entity is TRUE.(Example: Custom field of the Customer Order page is getting mandatory when the value of the custom field added in the Sales Part page is set to True.)Does anyone know if this is possible?Can this be done using a custom event or using a PL/ SQL expression in the firstly mentioned custom attribute?This seems to be impossible to do via the page designer.Thank you.
Hi,Our customer has a requirement to remove/ modify some custom navigator nodes added to the navigator tree. Customer environments are currently at 21R2, and it is not possible to remove/ modify the custom nodes added to the navigator tree, receiving a client error (this is a bug and RnD informed that the fix will be only available with 22R1).As a workaround, our customer is questioning whether it is possible to reinitialize the navigator tree.Does anyone know whether this is possible?Thank you!
Hi Community,According to Application Online Documentation, we can use Shop Order Operations window to view and edit details of shop order operations that are of order type Manufacturing, Repair, and Prototype.But does anyone know what is the reason for not allowing “Assembly” and “Disassembly” type shop order operations in Shop Order Operations window?Best Regards,Shani
Noticed a SO series in a customer environment with the following issue.Issue: "Handling Unit Structure" is not updating when we add handling units in the "Shop Order Handling Unit Structure" screen. Any idea what might be the reason for this?I tried to recreate the issue by creating a new SO using the same part, but the SO Handing Unit structure updated when I added/ removed handling units.
Is it possible to reschedule a single past due shop order?If we use the following option, then we have to reschedule all the past due Shop Orders belonging to a Site.Customer requirement is to reschedule specified past due SOs.
Hi All,Is there any way to remove a recipe structure?(Not phase out/ replace)
Hi Community,I'm receiving the following error while trying to remove a branch (level 1) from a TOP Level DOP Order.(RMB on DOP Order ID 2 Line -> Remove Specific Branch(es))Environment: APP10 Regional TEST LKP Level 1 DOP Order is in cancelled state. After further analyzing, I noticed that the subsidiary DOP Orders are also cancelled.1. Any idea what might cause the above mentioned oracle error when removing the mentioned branch?Noticed that the Due Date of this DOP Order is in the past and the demand source is not mentioned in the DOP Header.2. How to find the demand source when it is not mentioned under the Demand Tab of the DOP Header?Thank you in advance.-----------------------------------------------------------------------------Not sure whether this is a bug in Core. I followed functional flow (but demand created via a customer order), and created the following DOP Header with the same TOP Level Part. Then cancelled the level 1 DOP order and tried to remove the level 1 branch
Hi Community,I came across the below mentioned question while conducting a functional investigation.According to the help note, a backwards scheduled Shop Order is scheduled to start on the Need Date minus the lead time to manufacture the order.Does anyone know how to calculate the exact lead time to manufacture the order? Help note,Thank you in advance.
I was trying to create MRP (Perform Site MRP) and this is the error text mentioned in the background job.Environment: APP10 Regional TEST CMB I tried the same in APP10 TECH CMB as well. But received the same error twice.Does this happen because of an issue with the Customer Order? Any thoughts/suggestions on how to resolve this/ complete MRP would be highly appreciated. (There is a similar question for “Perform Project MRP” which is posted 11 months ago but with no answer.)
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.