HiWe were were close to implement IFS Aurena scan It 10 - Wadaco process. But the latest app version android 10.14.1362.0 seems to have reversed sorting order compared to previous versions. (We run version IFS 10.13). In previous appversions (and still in Aurena and EE) the sort order have always been to show the latest scanned data on top of the list in the app. Now it is reversed and the user have to scroll to the bottom of the window to see if the latest scan was correct. Is there a setting that we need to change? (I know about the sort order of feedback items in wadaco, but this is not the issue.). The processes work as expected in Aurena and EE-client but not in the lates appversion.
Hi We are trying to find the best way to utilize IFS Non Conformance Report for working according to the 8D-method. This is standard in the automotive industri and we are obliged to document according to this method. Has anyone else done this and found best practice for this in IFS? We are thinking of a couple of alternatives: Create one action in the NCR, then create/process one CAPA for this but it doesn´t cover all the 8 steps. Create 8 actions in the NCR to represent the 8 steps in the method. Create CAPA actions for step 3 and 5 in the method if necessary. (It is a lot of steps/administration to handle each action) Create one NCR with one Capa, then create 8 actions in the CAPA.
Hi, I am trying to set one of the fields to mandatory in the IFSAurenaScanIT app 10 Tried to set the Aurena field to “Required”, but there is no impact on the IOS app behaviour.
Hi,We are testing DDMRP and think this planning model is useful for us in a Make To Stock scenario for automotive type customers.Automotive customers send us a delivery schedule for ~6 months of demand. When I try the DDMRP it creates only one requistion to fill up stock to the top of green level. I would like it to continue to create requistions for the complete 6 months horizon . The reason is that we plan the capacity load based on requisitions and that we want the demand from the top level part to show on the lower BOM-levels.(We would only “firm” the first requisition in a planning)Is there a parameter that I am missing, or is DDMRP designed for “short term planning”?Sorry for the swedish screen dump, but it shows that only one requistion is created. Then the stock goes negative 2021-07-13 without any new requistion created by the DDMRP.
Is it possible to change the global contex for a Aurena dialog page?In this example I want to modify the fields that is visible for the screen “Pick Part by Choice”. This page is possible to open from “Report picking of pick list lines”I can´t find where to modify the list in the page designer.
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.