Hi,when I connect a PO manually to an activity project, the “Net Amount/Base” is changed in automatic to a different amount. What’s the logic behind it? Why and how it is changed? Connect a PO manually to an activity project - I mean that on PO view, I right-click on the PO line > Project Connection > Connect to Activity > select the appropriate activity > ok Thank youPaola
Hi, we use a lot the pre-defined pre-posting for projects: I was wondering: is there a chance to set a pre-posting related to a single Activity of the project? Currently we are only able to set the pre-posting at Project level or Sub-project level. We would like to have, for each activity in a project, a different pre-posting. Paola
Hi,we are trying to set a basic budget control for projects. The primary objective we want to achieve is, in relationship to a project, to stop a purchase requisition or a purchase order when their cost exceeds a predefined budget. I’m looking into how to create budget in Forecasting Module: selecting the project > creating forecast > choosing Cost Estimated on activity level and keeping the EAC Recalculated. After confirming and approving, I set the forecast as active budget. Then I enable budget control for the single project.Setting rules (in Project Budget Control Rules List window) I decide on which cost element the budget should apply.I would like to know, at this point is the budget already working? On which cost is the budget having control (Committed Cost/Used Cost/Actual Cost/..?) ? Is there a visual alert if a user attempts to exceed the budget? I don’t have the possibility to make proper tests right know, so that’s why I’m asking.Thank you, Paola
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.