Hi,
we use a lot the pre-defined pre-posting for projects:
I was wondering: is there a chance to set a pre-posting related to a single Activity of the project? Currently we are only able to set the pre-posting at Project level or Sub-project level. We would like to have, for each activity in a project, a different pre-posting.
Paola