Hi, In MS Level 1 , I set my parts to “Do Not Create S/P Req”, then run MS calculation.Then, instead of “Shop Order Req” , it creates “Fixed MS Supply” (60 pcs), while, how to consume the “MS Supply” ? I tried to create “Shop Order Req” -> “Shop Order”(60 pcs) manually,then run “MS Level 1 Calc” again. And find “MS Supply” number keep same.Finally, Total Supply just doubled : “MS Supply: 60” + “Shop Order: 60 ” = 120.
Hi, could anyone tell me which font does IEE using? (APP10)I ask the question because for some PC of my cusomter IFS dispaly null □ for some Japanese charactertics.
Hi, currently, our customer has the following requirements:For one certain Engineering Part , eg: Parts-A,after “Engineering Transfer”:in Site-1 , it is manufacture partsin Site-2, it is purchause partsCan IFS do this? and how?(because manufature/buy is attribute of “Engineering Part”, not “Part Transfer Template”, seems IFS cannot meet this requirement. )
Hi, In IFS Aurena or IEE , by which menu I can attache parts into Handling Unit? eg: in there are 10 parts-A in stock, I would like to put 5 in Box-1 and other 5 in Box-5. ※in WaDaco, I know we have “ATTACH_PART_TO_HANDLING_UNIT” procss , but in Aurena or IEE , I Cannot find similiar menu.
Hi, our customer has a requirement to generate a rework order(shop order) in IFSinside the rework order, (1)It should indicate which component need to be dis-assembly(2)And record the actual dis-assemblied Serial No and re-assebmly Serial No(3)And record the time and cost. In IFS, is there any function can meet this requirement?
Hi, Instead of reserve actual stock , can customer order line reserve to a shop order?
Hi, I would like to ask, for IFS “Routing” , How does it support SubAssy?Is there any workaround for it? (the attached pic is the image) background-customer don’t want to create a seprate Routing for SubAssy, because seperate Routing means they have to create dedicate Shop-Order and dedicate Product No for SubAssy. And they have 20+ SubAssy.
Hi, I'm preparing a warehouse demo for customer on APP10 UPD10.Inside the demo, I will set the "Stardard Putaway Qty" to 3.And set the PO Receive Qty to 5.So, I think when I perform put-away,IFS will cut it to two trasnport task1st: qty-32nd: qty-2While, it is still only one transport task.Is there anything I missing?(I already set the storage zone for the inventory parts.)
Hi , my customer very instested in WaDaco Aurena Native. While, there are still a few functionality they required are NOT in the WaDoCo "process".So, they want to ask , if we are able to IFS Development Studio to develope custom "Data Colloection Process". (or only R&D can do this.)
Hi , does IFS Data Mirgration Tool support Delete? and how?Especially for the Excel Add-IN.Thank you very much.
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.