There are times when Forecast is staying inside of Demand Time Fence and driving requirements into MRP. Some of the forecast is 2+ years old. We use Demand Planner to load forecast into MS 1.
What sets this date, we have been using IFS for 3 years and this field is always blank.
Release SO get message that default structure revision is not effective on started date of 10/7/2021 (us format), Inventory Part is active, recipe structure is Buildable with revision date of 1/1/2021 (us date), Inventory Revision tab has product status as Not In Effect with effective date of 1/1/2021 (us date). We loaded the data around the same time and I have some parts that show Product Status as In Effect and some that do not, can’t figure out what is causing this. All structures and routings are buildable.
We have an operation on a SO that was closed and reopened that we can not see in SFWB. The operation shows as Partially Reported. I have tried the different Selection and Dispatch Rules and it didn’t help. You can see it with the Shop Order entered, which doesn’t help us, we have folks using it based on their work center.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.