Hi, is there anyone out there who knows if it is possible to group combinations of account and code_b in IFS Cloud ? For example, Code_B = xxx or YYY and Account = 3000..3100 as FabricResult etc. Best regardsJonas
Hi, does anyone know what might be wrong with the below code. When I try to add this to a custom field, I get error in validating the field. I’m using two different IAL’s which is located on ifsinfo domain: SELECT CASE WHEN &AO..PART_CATALOG_API.Get_Configurable_Db(a.PART_NO)='CONFIGURED' THEN a.QTY_ONHAND*c.CONV_FACTOR_M3ELSE a.QTY_ONHAND*b.CONV_FACTOR_M3END as M3 FROM INVENTORY_PART_IN_STOCK a LEFT JOIN &IAL..M_CONV_FACTORS b ON a.PART_NO = b.PART_NO AND &AO..INVENTORY_PART_API.Get_Unit_Meas(a.CONTRACT, a.PART_NO)=b.UNIT_CODE AND b.CONV_UNIT_CODE = 'N_M3' LEFT JOIN &IAL..M_CONV_FACTORS_KONFIG c on a.CONTRACT = c.CONTRACT AND a.PART_NO = c.PART_NO AND a.CONFIGURATION_ID = c.CONFIGURATION_ID AND c.CONV_UNIT_CODE = 'N_M3' WHERE a.CONTRACT IN ('163','272','2721','2722') AND a.CONTRACT = :CONTRACT AND a.PART_NO = :PART_NO AND a.CONFIGURATION_ID = :CONFIGURATION_ID; I’ve tried different solutions for the &IAL parameter. I’ve tried to write ifsinfo, &IAL. and &IA
Hi, does anyone know if it’s possible to create a custom menu like below: Full length of the URL is:ifsapf:frmAvailabilityPlanning?EXTERNAL_SEARCH=CONTRACT%3D{&CONTRACT}%26PART_NO%3D{&PART_NO}%26PROJECT_ID%3D%23 This works fine and takes the user to the following window: However, I would like the user to land on the tab named “Tillgänglighetskontroll”. Is this possible? If so, how do I change the URL so the user end up on the specified tab?BRJonas
We use IFS apps 9 and we have a scenario where we have a DOP-order connected to a project. In the DOP-structure we are manufacturing configured parts that are to be used as material in the final construction. During the production, the manufacturing cost for the configured part belongs to a different accounting group and different cost element which leads to that the cost first enters the project on the element for the configured manufactured part and then the cost is moved to the cost element for the final product when it is used as material on that. The main problem is that the project has cost and revenue estimates on the element of the final product so it’s not ideal due to that the project manager can’t se the real progress in the projekt until it enters the element for the final product. The problem is also that the manufactured configured parts sometimes is sold as is and we never put configured parts in stock since they have the same PART_NO BUT can be different products depend
Hi, we are currently on our way to implement the project module in our apps 9 environment and an enduser asked the following: does anyone know a good way to claim capacity in production for project needs, i.e. to make sure that there is free capacity for the manufacturing demands in a specific project?Br Jonas
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.