When engineering creates new BOM, the top level and any newly created P/Ns will have a phase in date matching the date it was created. When the BOM is transferred to manufacturing, and becomes product structure, no supply reqs will be generated unless phase in date is changed to be in the past. A sub-component must have phase in date that is before its top level phase in date.
Hi All,when supplier is not added in approved supplier list and if there are 10 part number in the PO, when authorization is triggered, authorization tab shows ASL authorization 10 times /10 lines,purchase group is same for all the lines but still ASL authorization triggers shows 10 times.Any thoughts
Hi how I can see the my shop order progress with respect to my customer order delivery date. our complete process is project based and project inventory delivery.shop orders are created from PMRP and is any graphical presentation or planning screen is available to see the all shop order progress with respect to customer order delivery date.based on this information, user can plan or push the shop order which is lagging. thanksPramod
Hi All, Can you suggest the best way to handle materials which is not used in shop order.we have issued 10 kg of welding materials and only 6kg consumed and 4 kg we want to put to stock with simple process steps .is the shop order material un issue is the only way.? Thanks
Hi ,we are planning to integrate IFS Apps10 with 3rd part (advanced planning system-PSI).any documents or ref available similar interface . Thanks
Hi ,Any user manual / process details for maintaining tools in IFS.(shop order tools issue for operations, purchasing process of tools etc) Thank you.
Hi ,when we run PMRP for demand , PMRP not pick non-inventory sales part demand and not create any purchase req.currently this works for only inventory parts,is this possible ..? any setting Thanks in advance.
Hi All,In IFS Apps 10, any standard report/option available to print barcode like Label from shipment information
Hi ,We have customer order with 100+ lines and packing structure created manually as its changes from order to order with different combinations.Any possibilities to import handling unit structure from Excel to IFS..?Thanks
Hi , Any document / process flow showing the how to handle manufacturing stock / issuing to shop order/consumption process in IFS. Thanks
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.